Audiometry Booth Installation for Vehicles and Fixed Sites
We install the audiometry booth in a mobile vehicle or a fixed medical screening unit. Layout, insulation and ventilation are settled at the site survey.
Where is an audiometry booth installed?
An audiometry booth is installed in one of two places: inside a mobile occupational health vehicle or in a fixed medical screening unit. The regulation requires the hearing test to be done in a quiet booth (RG 20.01.2022 / 31725, art. 10/1-b); the booth, staff and device area must together be at least 4 m² (art. 10/1-e).
The technical features of the booth, a summary of the regulation and the price items are on the audiometry booth product page. Last updated: 11.11.2026. This information is for guidance only, as of 11.11.2026.
Where is the booth installed?
In a mobile vehicle
The booth is installed on the vehicle platform. The layout is drawn together with the interior plan of the vehicle. The test is run with the engine off, and the booth insulation is checked again after an accident (art. 7, 10).
In a fixed medical screening unit
The booth is installed on a fixed floor. The layout is set at the site survey, once the area of the space and the ambient noise have been seen. The booth, staff and device area must together be at least 4 m² (art. 10).
Installation steps
-
1
Site survey
The vehicle or space where the booth will be installed is seen and measured.
-
2
Layout plan
The booth, staff and device area are written into the plan.
-
3
Booth assembly
The booth is assembled in place; ventilation and lighting are connected.
-
4
Audiometer
The audiometer is placed in the booth and put into operation.
-
5
Handover
At handover, the ÜTS transfer notification is made to your company.
Structure of the booth
- ·Structure: Double-wall MDF + steel
- ·Registration: registered in the Product Tracking System (ÜTS)
- ·Installation: fixed floor or vehicle platform
- ·Ventilation: silent fan system
- ·Lighting: LED interior lighting
ÜTS registration
The medical devices we supply are registered in the Product Tracking System (ÜTS); at handover, the ÜTS transfer notification is made to your company. You complete the inventory entry within 30 days (RG 31725, art. 17/2).
Want to Get a Quote or More Information?
Reach us on WhatsApp or by phone. The 24/7 fault line takes your call.